Displaying 1 - 3 of 3

Collabera
Everett, Washington
Job Title: Inventory Planner III Duration: 11+months Location: Everett, WA Pay Range: $21/hr - $24/hr Schedule: The schedule is currently unknown They need to be pretty flexible There will likely be some weekend shifts or maybe some second shifts (2-10pm) They are still figuring out the schedule, but they likely won’t have a set-in-stone schedule because it’s going to change during the duration of
Collabera
San Antonio, Texas
The Material Planner will be responsible for planning, scheduling, and monitoring the movement of materials through the production cycle. This role involves determining material requirements from engineering and production schedules, as well as coordinating the efficient movement of materials with purchasing, production, and engineering teams. Develop specifications for new contract orders Respons
Collabera
Westborough, Massachusetts
Title: Production Control (Production planning/ Material manger) Location: Westborough, MA 01581 Pay rate: $45/hr to $48.81/hr Duration: 10 months Responsible for: Engineers all end-to-end Material Flows from supplier receipt to lineside delivery in order to efficiently meet production requirements Developing a Plan for Every Part (PFEP) to document part numbers, quantities, suppliers, storage loc